Wem · SY4
Sewage Treatment Plant Installation in Wem
Design and installation of package sewage treatment plants for homes and small businesses, including upgrades from non-compliant septic tanks. Serving Wem and the surrounding villages, including Clive, Loppington, Edstaston, Aston.
A package sewage treatment plant treats waste water to a far higher standard than a septic tank, clean enough that the treated effluent may legally discharge to a watercourse as well as to ground. For many rural Shropshire properties, especially those on heavy clay where soakaways struggle, a treatment plant is now the most practical route to a compliant system.
The villages around Wem grew up along lanes rather than sewers, and most outlying properties run on private drainage. Older cottages often have tanks of considerable age and uncertain history, and nearby Wem Moss, like the other mosses, marks ground where drainage has always needed care.
Treatment plants are also the standard answer for properties caught by the 2020 General Binding Rules. If your existing septic tank discharges directly to a ditch, stream or brook, that arrangement is no longer permitted and a treatment plant upgrade is one of the two recognised fixes.
Ground conditions around Wem
The plain around Wem is glacial ground: clays and marls over much of it, with sandier rises that drain more kindly. It is classic percolation-test country, where two fields a mile apart can give opposite results, and where guessing instead of testing leads to soggy, short-lived soakaways.
Watercourses and the rules around Wem
The River Roden runs through the town and takes the district’s drainage, fed by a lattice of field ditches. Many rural tanks sit within easy reach of a ditch, so the General Binding Rules and their ban on septic discharge to watercourses are directly relevant across this area.
What the service includes
- Plant sizing based on bedrooms and occupancy, not guesswork
- Supply and installation of plants certified to EN 12566-3
- Upgrades from failed or non-compliant septic tanks, including tank decommissioning
- Drainage field or watercourse discharge arrangements that meet the General Binding Rules
- Electrical connection, commissioning and handover
- Ongoing annual servicing once the plant is in
Where we go around Wem
As well as Wem itself, we cover the surrounding villages and farms, including Clive, Loppington, Edstaston, Aston, Tilley, Nonely, Northwood. If you are somewhere smaller or somewhere between, call anyway: if the lane goes there, so do we.
Sewage Treatment Plant Installation: common questions
What is the difference between a septic tank and a treatment plant?
A septic tank only settles solids out and relies on the ground to finish the job, so it may only discharge to a drainage field. A treatment plant actively treats the waste using air and bacteria, producing effluent clean enough to discharge to a watercourse under the General Binding Rules.
Do treatment plants smell or make noise?
A correctly installed and serviced plant should produce no noticeable odour. The air blower makes a low hum, similar to a fish tank pump, and is normally housed where it will not be heard.
How long does installation take?
Typically two to five days on site for a domestic plant, depending on access, ground conditions and whether a drainage field is being installed at the same time.
Other services in Wem
Sewage Treatment Plant Installation elsewhere in Shropshire
Need sewage treatment plant installation in Wem?
Call for straight answers and a fair price, or send the form and we will come back to you promptly.